Diagnosis
The system has found that the planning scenario is inconsistent. Thisis usually caused by the planning scenario being transported in a waythat is not permitted (see below).
System Response
Due to this data inconsistency, the planning scenario cannot be used.
Procedure
Adjust the planning scenario. You can do this using programRWIS_PLAN16, which will be started by the system following thismessage. This program initializes different internal control entriesand deactivates the planning scenario. After executing the program, youneed to reactivate the planning scenario.
Procedure for System Administration
To avoid receiving this message, the scenario should only betransported using the methods allowed.
Examples of incorrect> ways of transporting:
- Copying entire clients (for example, using transaction SCC1 without
specifying a transport request)
- Manually including the table entries belonging to the planning scenario
in a transport request and transporting in any old way
The correct> way to transport a planning scenario is to activatethe planning scenario with automatic completion of a Customizingrequest.
You then have the following options:
- Release the request and transport using the standard tools of the
transport system
- Exact transport of the request using transaction SCC1 ("Copy as per
Transport Request").
This is only possible if the source and target of the transport are inthe same system.
For technical reasons, you must ensure that the after-import method ofthe transport object WIS_PLAN, which belongs to the planning scenario,is executed.