Diagnosis Either the EPA is not assigned to the relocation/relocation stepselected or it does not contain a master schedule item, which, however,is a prerequisite for planning. System Response The system does not permit planning with this EPA. Procedure Check whether the EPA is assigned to the force element and therelocation for the required period. If this is the case, check whetherthe EPA contains a master schedule item. |