Diagnosis The current assignment of planning characteristics>to planning steps> corresponds to a global planninghierarchy that is not a pure tree structure. Consequently, theproportional factors for distributing plan data between planning levelsare no longer uniquely specified, or they have reciprocal dependencies.System Response The link method selected cannot be created. Procedure Check the sequence of the planning levels of the source and targetplanning steps. The planning levels common to both steps must be in thesame order, without any interruption at the peaks of the selectedplanning characteristics. All characteristics of the planning step withthe lower number of planning levels must be contained in the otherplanning step. Example 1: Planning levels source planning step: SOrg DChan Planning levels target planning step: SOrg DChan Plants Therefore the linking method disaggregation is possible. Example 2: Planning levels source planning step: SOrg DChan Plants Planning levels target planning step: SOrg DChan Therefore the linking method aggregation is possible. Example 3: Planning levels step 1: SOrg DChan Plants Planning levels step 2: SOrg DChan MatGrp1 MatCl The linking methods aggregation and disaggregation are not >possible as the planning level WERKS is not available in step 2 andMatgrp1 and MatCl are not available in step 1. Define step 3 with characteristics. DOrg DChan Then the aggregation or disaggregation of planning figures from step 1to step 3 or step 2 to step 3 is possible and therefore also theindirect transfer of plan data from step 1 to step 2 and vice versa. |