Id | Description |
---|---|
WRF_PRC_SCD435 | Ship-to party missing; GR processing time cannot be determined |
WRF_PRC_SCD436 | Dateline will be created with default planned delivery time of 99 days |
WRF_PRC_SCD437 | Simplified date calculation carried out with planned delivery time |
WRF_PRC_SCD438 | Error in scheduling, date line cannot be calculated |
WRF_PRC_SCD439 | Automatic date shift will be executed with an interval of zero days |
WRF_PRC_SCD440 | The interval between 2 dates is greater than 999 days |
WRF_PRC_SCD441 | You can no longer change the transportation chain at this point |
WRF_PRC_SCD442 | The time sequence of the start dates is incorrect |
WRF_PRC_SCD443 | Date lead time or date follow-up time for date &1 will be modified |
WRF_PRC_SCD444 | The total interval is greater than 999 days |
WRF_PRC_SCD445 | &1 was changed from &3 to &4 in accordance with delivery cycle &2 |
WRF_PRC_SCD446 | &1 was changed from &3 to &4 in accordance with order cycle &2 |
WRF_PRC_SCD447 | It is no longer possible to change the transportation chain |
WRF_PRC_SCD448 | System could not determine The calculation type |
WRF_PRC_SCD449 | It is no longer possible to change vendor/switch transportation chain |
WRF_PRC_SCD450 | It is no longer possible to switch the internal transportation chain |
WRF_PRC_SCD451 | Error while transferring actual dates from the old dateline |
WRF_PRC_SCD452 | Actual start date posted is not last date on dateline |
WRF_PRC_SCD453 | Incorrect scheduling call; see the long text |
WRF_PRC_SCD454 | Transfer date for Incoterm &1 found w. normal, but not dispatch method &2 |
WRF_PRC_SCD455 | Combination of distribution center and dispatch method is not permitted |
WRF_PRC_SCD456 | Combination of store and dispatch method is not permitted |
WRF_PRC_SCD457 | Date &1 has already been posted and may not be changed |
WRF_PRC_SCD458 | Incorrect scheduling call, start date was not transferred correctly |
WRF_PRC_SCD459 | Int.trnsp.chain not maintained in supplying plnt asgt for &1 nor in DC &2 |
WRF_PRC_SCD460 | Change of internal transport chain not possible |
WRF_PRC_SCD461 | Automatic date shift for the order date is not permitted |
WRF_PRC_SCD462 | You cannot select the order date as the start date |
WRF_PRC_SCD463 | Switch to internal transportation chain &1 is not possible |
WRF_PRC_SCD464 | Switch to internal transportation chain &1 is not possible |
WRF_PRC_SCD465 | Assignment of ship-to party and transportation chain not permitted |
WRF_PRC_SCD466 | Combination of ship-to party and dispatch method is not permitted |
WRF_PRC_SCD467 | Automatic date shift to the past is not permitted |
WRF_PRC_SCD468 | Scheduling is deactivated |
WRF_PRC_SCD469 | No transportation chain is assigned to vendor &1 |
WRF_PRC_SCD470 | Transportation chain &1 (&2) for dispatch method &3 is not an ext. TC |
WRF_PRC_SCD471 | Transportation chain &1 (&2) for dispatch method &3 is not an int. TC |
WRF_PRC_SCD472 | No transportation chains are assigned to info record and vendor &1 |
WRF_PRC_SCD473 | Date &1 occurs more than once in dateline; this is not permitted |
WRF_PRC_SCD474 | Informative date without predecessor &1 was transferred without a date |
WRF_PRC_SCD475 | Informative date without predecessor &1; interval is set to 0 |
WRF_PRC_SCD476 | Date &1 of the informative date &2 is before the order date &3 |
WRF_PRC_SCD477 | Date &1 of the informative date &2 is after the delivery date &3 |
WRF_PRC_SCD478 | Internal transportation chain cannot be copied into the dateline |
WRF_PRC_SCD479 | No transportation chain is assigned to the info record |
WRF_PRC_SCD480 | Staging time is zero |
WRF_PRC_SCD481 | All Dates Already Posted, No Start Date Could be Determined |
WRF_PRC_SCD482 | No Date Postponement Possible Since All Dates Already Posted |
WRF_PRC_SCD483 | The most recently posted date is not in the new transportation chain |
WRF_PRC_SCD484 | No transportation chain assigned in vendor master data |
WRF_PRC_SCD485 | Deletion of external transportation chain is not allowed |
WRF_PRC_SCD486 | Deletion of internal transportation chain is not allowed |
WRF_PRC_SCD500 | Date line cannot be checked |
WRF_PRC_SCD501 | Date line is not consistent |
WRF_PRC_SCD502 | Date line &1 date_id &2: incorrect date type |
WRF_PRC_SCD503 | Date line &: different IDs |
WRF_PRC_SCD504 | Date line &1 date ID &2: &3 missing |
WRF_PRC_SCD505 | Date Line &1 Date &2: Plan Date Earlier Than Tolerance Date |
WRF_PRC_SCD506 | Date line &1 date ID &2 incorrect format: &3 |
WRF_PRC_SCD507 | Date line &1: &2 cannot have a preceding date |
WRF_PRC_SCD508 | Date line &1: &2 must be a operative date |
WRF_PRC_SCD509 | Date line &1: &2 must have a preceding date |
WRF_PRC_SCD510 | Dateline &1: &2 is inactive |
WRF_PRC_SCD511 | Dateline &1 Date &2: Predecessor Date is not an Operational Date |
WRF_PRC_SCD512 | Dateline &1 Date &2: Plan Date is Earlier Than Predecessor Plan Date |
WRF_PRC_SCD513 | Dateline &1 Date &2: Tolerance Date is Earlier Than Predecessor Tol. Date |
WRF_PRC_SCD514 | Date line &1: &2 is predecessor of more than one operative date |
WRF_PRC_SCD515 | Date line &1: preceding date &2 does not exist in date line |
WRF_PRC_SCD516 | Header structure of date line missing |
WRF_PRC_SCD517 | Date line ID missing |
WRF_PRC_SCD518 | Date ID missing |
WRF_PRC_SCD519 | Actual posting: &1 &2 &3 &4 &5 |
WRF_PRC_SCD520 | Dateline is empty |
WRF_PRC_SCD521 | Incoterm1 &1 Could not be Determined |
WRF_PRC_SCD522 | Incoterm2 &1 was determined in scheduling |
WRF_PRC_SCD523 | Transfer location &1 of dateline differs from Incoterm2 &2 |
WRF_PRC_SCD524 | Only general leg with country &1 since no transfer region is defined |
WRF_PRC_SCD525 | Incoterm1 was deleted; transfer location will also be deleted |
WRF_PRC_SCD526 | Cannot determine transfer date &1 in dateline |
WRF_PRC_SCD527 | Vendor &1 is monitored, but not transfer date &2 |
WRF_PRC_SCD528 | Transfer date is empty |
WRF_PRC_SCD529 | Informative Date '&1': Calculated Date is in the Past (&2) |
WRF_PRC_SCD530 | Operational date &1 may not be removed from dateline |
WRF_PRC_SCD531 | Actual-posted dateline &1 may not be removed from dateline |
WRF_PRGRP001 | No free internal price group number could be determined |
WRF_PRGRP002 | The to-date is earlier than the from-date |
WRF_PRGRP003 | The validity period overlaps with the previous one |
WRF_PRGRP004 | There is a gap between the validity period and the previous one |
WRF_PRGRP005 | Price level group &1 does not exist |
WRF_PRGRP006 | A date field of the price pattern is not filled |
WRF_PRGRP007 | A still valid price pattern was deleted |
WRF_PRGRP008 | A time gap is created as a result of the price pattern deletion |
WRF_PRGRP009 | Price level group &2 is already locked by user &1 |
WRF_PRGRP010 | The from-date cannot be set to infinity (31.12.9999) |
WRF_PRGRP011 | The price pattern for price level group &1 does not exist |
WRF_PRGRP012 | No price levels exist for price level group &1 |
WRF_PRGRP013 | Price level group &1 already exists |
WRF_PRGRP014 | The price level group field is not filled |
WRF_PRGRP015 | Price level group &1 is locked |
WRF_PRGRP016 | No description exists for price level group &1 |