Id | Description |
---|---|
/ISDFPS/FDPDAMPO121 | Error when calling method & |
/ISDFPS/FDPDAMPO122 | No stockholding storage location has been entered for force element & |
/ISDFPS/FDPDAMPO123 | Material & is not assigned to an MPO |
/ISDFPS/FDPDAMPO124 | Material & is assigned to MPO & and not to MPO & |
/ISDFPS/FDPDAMPO125 | Material & is assigned to more than one MPO |
/ISDFPS/FDPDAMPO126 | Target and source force elements are identical |
/ISDFPS/FDPDAMPO127 | No other force elements found |
/ISDFPS/FDPDAMPO128 | You have already reached the starting element & |
/ISDFPS/FDPDAMPO129 | You have already reached the lowest hierarchy level |
/ISDFPS/FDPDAMPO130 | Select a plan or a stock |
/ISDFPS/FDPDAMPO131 | You can only change or delete plans for force element & |
/ISDFPS/FDPDAMPO132 | Not a valid planning period |
/ISDFPS/FDPDAMPO133 | Plan not feasible; a plan already exists from & to & |
/ISDFPS/FDPDAMPO134 | Planning period does not include key date & |
/ISDFPS/FDPDAMPO135 | Plan created successfully |
/ISDFPS/FDPDAMPO136 | No changes were made |
/ISDFPS/FDPDAMPO137 | Plan was changed successfully |
/ISDFPS/FDPDAMPO138 | Plan/requisition was deleted successfully |
/ISDFPS/FDPDAMPO139 | Batch &1 does not belong to serial number &2; replace with &3 |
/ISDFPS/FDPDAMPO140 | Select a source force element |
/ISDFPS/FDPDAMPO141 | Material is not assigned to an MPO |
/ISDFPS/FDPDAMPO142 | You cannot plan materials which have already been ordered |
/ISDFPS/FDPDAMPO143 | Select the plans you either want to delete or create |
/ISDFPS/FDPDAMPO144 | Only plans be converted into purchase orders |
/ISDFPS/FDPDAMPO145 | Only select plans you want to delete |
/ISDFPS/FDPDAMPO146 | Select one plan you want to delete |
/ISDFPS/FDPDAMPO147 | Planning for & & GUID & does not exist |
/ISDFPS/FDPDAMPO148 | Quantity at material level is no longer sufficient |
/ISDFPS/FDPDAMPO149 | Object is currently locked; repeat planning |
/ISDFPS/FDPDAMPO150 | Cannot create plan at serial number level |
/ISDFPS/FDPDAMPO151 | Cannot create plan at serial number level |
/ISDFPS/FDPDAMPO152 | Material plan cannot be changed |
/ISDFPS/FDPDAMPO153 | Material plan cannot be changed |
/ISDFPS/FDPDAMPO154 | Plan to be changed no longer exists |
/ISDFPS/FDPDAMPO155 | Plan cannot be created from perspective of supplying element |
/ISDFPS/FDPDAMPO156 | Conversion possible from recipient perspective only |
/ISDFPS/FDPDAMPO157 | Select a line |
/ISDFPS/FDPDAMPO158 | Purchase order & was created successfully |
/ISDFPS/FDPDAMPO159 | Serial number &1 has already been reserved by RD requisition &2 |
/ISDFPS/FDPDAMPO160 | Force element & does not have status 'active" |
/ISDFPS/FDPDAMPO161 | Conversion possible from return deliverer perspective only |
/ISDFPS/FDPDAMPO162 | Cannot determine serial number profile for material & plant & |
/ISDFPS/FDPDAMPO163 | Planning possible for unrestricted-use stock only |
/ISDFPS/FDPDAMPO164 | Delivery & was created successfully |
/ISDFPS/FDPDAMPO165 | Purchase requisition & was created |
/ISDFPS/FDPDAMPO166 | Purchase requisition & changed |
/ISDFPS/FDPDAMPO167 | Purchase orders were created |
/ISDFPS/FDPDAMPO168 | Supplying plant and storage location must be assigned; carry out search |
/ISDFPS/FDPDAMPO169 | Row & cannot be converted automatically |
/ISDFPS/FDPDAMPO170 | Material planning object & does not exist |
/ISDFPS/FDPDAMPO171 | Status & is not defined |
/ISDFPS/FDPDAMPO172 | Organizational area & does not exist |
/ISDFPS/FDPDAMPO173 | Country key & does not exist |
/ISDFPS/FDPDAMPO174 | The combination of country & and organizational area & does not exist |
/ISDFPS/FDPDAMPO175 | Purchase requisition already released |
/ISDFPS/FDPDAMPO176 | Select a purchase requisition |
/ISDFPS/FDPDAMPO177 | Row & cannot be converted |
/ISDFPS/FDPDAMPO178 | Reference row must belong to the same material planning object |
/ISDFPS/FDPDAMPO179 | Enter the return date |
/ISDFPS/FDPDAMPO180 | Force element & is locked by another user |
/ISDFPS/FDPDAMPO181 | Purchase requisition & is not included in the release procedure |
/ISDFPS/FDPDAMPO182 | You do not have authorization for loan procedure |
/ISDFPS/FDPDAMPO183 | Purchase requisition & already released |
/ISDFPS/FDPDAMPO184 | MPO & does not contain any material; planning cannot be carried out |
/ISDFPS/FDPDAMPO185 | Requisition not relevant for PM |
/ISDFPS/FDPDAMPO186 | Cannot carry out release procedure until after HU assignment |
/ISDFPS/FDPDAMPO187 | Select just one row |
/ISDFPS/FDPDAMPO188 | Specified organizational areas do not exist |
/ISDFPS/FDPDAMPO189 | Enter at least one force element |
/ISDFPS/FDPDAMPO190 | Specified force elements do not exist |
/ISDFPS/FDPDAMPO191 | Specified material planning objects do not exist |
/ISDFPS/FDPDAMPO192 | Usage type & is not defined |
/ISDFPS/FDPDAMPO193 | Evaluation for MRP area is possible for one force element only |
/ISDFPS/FDPDAMPO194 | Evaluation with substructure is possible for one force element only |
/ISDFPS/FDPDAMPO195 | Available quantity is only & |
/ISDFPS/FDPDAMPO196 | Serial number &1 of batch &2 has already been reserved |
/ISDFPS/FDPDAMPO197 | EPA & not assgnd to FE/reloc.step & or does not contain a mstr schdl itm |
/ISDFPS/FDPDAMPO198 | EPA & is not available |
/ISDFPS/FDPDAMPO200 | Force element &1 is not assigned to relocation &2/step &3 |
/ISDFPS/FDPDAMPO201 | Force element &1 is not assigned to a relocation |
/ISDFPS/FDPDAMPO202 | Relocation step is only scheduled until &1; is the deliv. date too late? |
/ISDFPS/FDPDAMPO203 | Relocation step type &1 is not permitted; type must be 1 |
/ISDFPS/FDPDAMPO204 | Relocation step missing |
/ISDFPS/FDPDAMPO205 | Planning possible with selected relocation step only |
/ISDFPS/FDPDAMPO206 | Relocation step type &1 is not permitted |
/ISDFPS/FDPDAMPO207 | Cannot carry out planning for the past |
/ISDFPS/FDPDAMPO208 | None of the serialized matls has stock; SN planning cannot be carried out |
/ISDFPS/FDPDAMPO209 | Status of relocation is not 'Active'; can only be displayed |
/ISDFPS/FDPDAMPO210 | Selected stock is smaller than planned quantity |
/ISDFPS/FDPDAMPO211 | Relocation is planned as of &1; delivery date is not possible |
/ISDFPS/FDPDAMPO212 | Relocation is planned until &1; delivery date is not possible |
/ISDFPS/FDPDAMPO213 | Serialized material should be planned at serial number level |
/ISDFPS/FDPDAMPO214 | Cannot assign line to relocation/relocation step |
/ISDFPS/FDPDAMPO215 | No relocation selected; planning carried out without assignment to reloc. |
/ISDFPS/FDPDAMPO216 | The selected serial numbers have different properties |
/ISDFPS/FDPDAMPO217 | Check the return date |
/ISDFPS/FDPDAMPO218 | Enter both the relocation and relocation step |
/ISDFPS/FDPDAMPO220 | Error creating the request HU |
/ISDFPS/FDPDAMPO221 | Pkg matl for whse HUs is not allowed to be the same as that for req. HUs |
/ISDFPS/FDPDAMPO222 | Handling unit & is still assigned to purchase requisition & |